TEARDROP PALLET RACK INSTALLATION INSTRUCTION

- Dec 24, 2017 -

Normally pallet rack is shipped in components form. To install the pallet rack, first of  all we need to understand all the components for each main part of the pallet rack.


1, Teardrop pallet rack is normally formed by upright frames, step beams, wire mesh decking, upright protector, pallet back stopper, frame row guard. The basic parts are frame and beam.


2, The first work is to install the teardrop pallet rack frame. Frame is normally made up of 2 uprights, 3 horizontal bracing, some diagonal bracing, base plate, bolts and nuts. customer need to count the packing list before start the installation work. Customer need to prepare some tools. Electric spanner is neccessory.


3, After assembled all the frames, then just stand up them and hang on step beams.Adjust the beam height till you are satisfied with it.


4, Customer can still install some accessory if there are.


Kingmore Racking is your reliable partner all the time. 