Teardrop Pallet Rack Installation Steps

- Feb 16, 2018 -

Belloware the simple installation steps :

1 ,Bracings assemble , horizontal bracings use the bolts and bracing block .

diagnal bracing only need to use the bolts 

Catch(12-05-09-3(02-16-17-05-09).jpg

2 ,Baseplate assemble , use the connect bolts assemble the baseplate to upright

 use anchor bolts fix the frame to the solid ground .

Catch1026(12-05-(02-16-17-05-09).jpg

3 ,Step Beam assemble , hang and fix the step beam on the upright ,and put the spring lock into the beam connector .

Kingmore beam safety locks are assembled on the beam connectors before step beams are packaged .

CatchBFA8(12-05-(02-16-17-05-09).jpg

4 ,The Whole Components
CatchE1F6(12-05-(02-16-17-05-09).jpg